Kontakt  |  De  /  En  /  It

Jetzt Kontakt aufnehmen

oder Kontaktformular abschicken
Kontaktanfrage erfolgreich versendet.

WWTP in Baden-Wurttemberg

Kläranlage in Baden-Württemberg

Background
The aim of the waste water treatment plant was to increase the gas yield as well as to reduce the amount of sludge and as a result of that the disposal costs.

Result
A batchtest showed an increase of the gas yield of the treated thickened surplus sludge of 11.5%.