WWTP in Baden-Wurttemberg
Background
The aim of the waste water treatment plant was to increase the gas yield as well as to reduce the amount of sludge and as a result of that the disposal costs.
Result
A batchtest showed an increase of the gas yield of the treated thickened surplus sludge of 11.5%.