Jühnde, Bioenergy village
Jühnde is the first bioenergy village in Germany and even worldwide. Heat and power demand is produced by a renewable energy biogas plant as well with photovoltaik technology.
Jetzt Kontakt aufnehmen
WEBER ENTEC GMBH & CO. KG
Im Ermlisgrund 10
D-76337 Waldbronn
T +49 (0) 72 43/ 72 88 980
F ++49 (0) 72 43/ 76 55 011
Jühnde is the first bioenergy village in Germany and even worldwide. Heat and power demand is produced by a renewable energy biogas plant as well with photovoltaik technology.
From 27 to 29 January Weber Entec presented the innovative products and developments on the Annual Conference and Trade Fair in Bremen.
Our partner United Engineers in Singapore won a tender for the Ulu Pandan waste water treatment plant, for substrate digestion of the surplus sludge. A plant with 16 BioPush ultrasonic reactors was installed. This brings Weber Entec’s disintegration technology into use in Singapore for the first time.
Since 2011, the AMPTS II system developed by the Swedish manufacturer Bioprocess Control has been marketed in Germany, Austria, Switzerland, and the Netherlands exclusively by Weber Entec. AMPTS stands for Automatic Methane Potential Test System.