Kontakt  |  De  /  En  /  It

Jetzt Kontakt aufnehmen

WEBER ENTEC GMBH & CO. KG

Im Ermlisgrund 10
D-76337 Waldbronn

T +49 (0) 72 43/ 72 88 980
F ++49 (0) 72 43/ 76 55 011

mail@weber-entec.com

oder Kontaktformular abschicken
Kontaktanfrage erfolgreich versendet.

WWTP in Baden-Wurttemberg

Kläranlage in Baden-Württemberg

Background
The aim of the waste water treatment plant was to increase the gas yield as well as to reduce the amount of sludge and as a result of that the disposal costs.

Result
A batchtest showed an increase of the gas yield of the treated thickened surplus sludge of 11.5%.